Every BOQ line with its price class, published source and dealer. Sort any column, filter by class, block, room or free text. Generated from the contractor package — nothing on this page is typed by hand.
Three price classes, no others.REF a published price was found and the source URL is cited on the line.
EST a banded estimate anchored on a published rate — not a quote.
RFQ market-quote-only; no number is invented.
Line prices are supply-level (material landed). The budget ladder additionally carries install
labour, freight and landing, so a block’s line roll-up always sits at or below its ladder band.
Totals
Roll-up by trade block
Trade block
Ladder band
Line roll-up (REF+EST)
Lines
Coverage
Roll-up by room
Read this before quoting a room. The BOQ is structured by trade, not by room, so these room
figures are a derived tag read off each line’s code, description and section — not a cost
allocation. A line that names two rooms is counted in both, so the room bands overlap and do not sum
to the project total. Lines that name no room (shell isolation, float floor, consumables) are grouped as
Shared / shell. The 3 LOCAL-VENDOR ALTERNATIVE lines (V-01..03) are excluded here —
they sit outside the budget ladder and are an either/or substitution, never an addition.
Use the trade-block roll-up above for anything contractual.